York Sun Pro ZR Packaged Rooftop Unit with Hot Gas Reheat – 3 to 12.5 Ton Gas Heat / Electric Cooling

SKU: N/A

The York® Sun™ Pro ZR is a convertible packaged rooftop unit sized 3–12.5 nominal tons on R-410A refrigerant, with a factory-standard hot gas reheat coil for dedicated humidity control. Available cooling-only or with gas/electric heat, with a common cabinet footprint and roof curb across all sizes. Supplied and installed across the GTA by 4Most Energy.

$55.00

Starting at:

Custom installation

How would you like it?

✅ Equipment only →Just add to cart.

What do you need?
Would you like a free site visit?
An installer checks your space, sizing and venting. Free, no obligation.
e.g. age of your current unit, home size, or space and access limits
Consent
By submitting, you agree to our Privacy Policy and Terms & Conditions.

No guesswork. Get your exact installation cost today.

3 People watching this product now!
 

The York® Sun™ Pro ZR is a convertible packaged rooftop unit sized 3–12.5 nominal tons on R-410A refrigerant, with a factory-standard hot gas reheat coil for dedicated humidity control. Available cooling-only or with gas/electric heat, with a common cabinet footprint and roof curb across all sizes. Supplied and installed across the GTA by 4Most Energy.

York® Sun™ Pro ZR Packaged Rooftop Unit with Hot Gas Reheat – Supplied & Professionally Installed by 4Most Energy

The York® Sun™ Pro ZR is a standard-efficiency convertible packaged rooftop unit purpose-built for applications that need active humidity control. Every unit ships with a factory-standard hot gas reheat coil, so no field-installed dehumidification accessory is required. It is rated up to 14.0 SEER on 3–5 ton models and 11.8 IEER on 6.5–12.5 ton models, across eight sizes from 3 to 12.5 nominal tons (ZR037 to ZR150), with gross cooling capacities from 36,000 to 154,000 Btu/h on R-410A refrigerant. Copper tube / aluminum fin coils and constant-volume blowers are standard, with a VAV/VFD option on 6.5–12.5 ton models. Two-stage gas heat uses aluminized steel (standard) or stainless steel (optional) tubular heat exchangers, and the unit is also available cooling-only or with electric heat. All sizes share a common cabinet footprint and roof curb with the Sun Pro ZH and ZJ lines.
Reliable dehumidification depends on correct field installation. Ontario installations require verified roof curb structural capacity, a properly sized gas line and venting for two-stage combustion, and electrical service matched to the unit's 208/230/460/575V, 3-phase rating. Reheat coil charge, combustion setup, and control staging must be commissioned correctly, or the unit will underperform against its rated capacity. 4Most Energy's licensed gas technicians perform combustion analysis, refrigerant charge verification for both the primary circuit and the reheat coil, and Smart Equipment™ controller commissioning on every packaged rooftop unit installation in Toronto and across the GTA, with each installation documented for TSSA and ESA compliance.

Replacement Option

The York® Sun™ Pro ZR can replace older Trane, Lennox, Daikin, Rheem, and AAON packaged rooftop units using an appropriate roof curb adapter, letting building owners add factory-integrated dehumidification without modifying existing roof penetrations or ductwork. Field-installed curb adapters are also available for transitioning from the York Sunline™ footprint. For larger 15–25 ton reheat applications, see the York Series 20 J**ZR.

Warranty
York backs the Sun™ Pro ZR with a 1-year complete unit warranty, a 5-year compressor warranty, and a 10-year aluminized steel gas heat exchanger warranty, extendable to 15 years with the optional stainless steel heat exchanger. 4Most Energy handles startup, combustion test documentation, and warranty registration on your behalf.

Why Install the York Sun Pro ZR with 4Most Energy?

Gas Heat & Combustion Expertise

Licensed TSSA gas technicians size the gas line for two-stage heat, verify supply pressure, and complete combustion analysis at startup.

Proper System Sizing

We start with a commercial block load calculation, then confirm tonnage, gas heat input, and electrical and gas capacity before ordering.

Professional Rooftop Installation

Crane or forklift placement using the base-rail rigging holes and forklift slots, curb verification, ductwork, gas, electrical, and controls coordinated in one project.

Reheat Coil Commissioning

Hot gas reheat setup and R-410A charge verification on both the primary circuit and the reheat coil, so the unit controls humidity and delivers its rated capacity.

Transparent Installation Planning

Before installation, we review the existing rooftop unit, curb, gas and electrical service, and access requirements, so your quote reflects the real scope of work.

Ongoing Maintenance Support

Semi-annual (spring and fall) reheat and evaporator coil cleaning, refrigerant charge checks, filter replacement, combustion analysis, and Smart Equipment™ diagnostics.

  • Factory-standard hot gas reheat coil on every ZR model — dedicated humidity control without a separate field-installed accessory, ideal for retail, medical, and high-occupancy spaces.
  • Standard-efficiency cooling up to 14.0 SEER (3–5 ton) or up to 11.8 IEER (6.5–12.5 ton), sized for applications prioritizing dehumidification over peak efficiency.
  • Copper tube / aluminum fin evaporator coils for proven reliability across the full tonnage range.
  • Service-friendly design the motor and blower slide out as one assembly, and a toolless door latch and hinged access panels simplify filter, compressor, reheat coil, and control box service.
  • Two-stage gas heat 70–75% capacity on 1st stage (3–5 ton) or 60% (6.5–12.5 ton), with aluminized steel (standard) or stainless steel (optional) tubular heat exchangers.
  • Smart Equipment™ control platform embedded LCD, on-board USB data logging, 5-fault diagnostic memory retained through power loss, and BACnet MS/TP, Modbus, N2, and Verasys communication.
  • Constant-volume airflow standard with a VAV/VFD option on 6.5–12.5 ton models for variable air volume duct systems.
  • Convertible side/down duct design side duct openings are covered at the factory and can be field-converted without panel cutting.
  • Full-perimeter base rails forklift slots on three sides and rigging holes for 3-way forklift access and overhead crane placement.
  • Common Sun Pro footprint shared with the ZH and ZJ lines, with field-installed curb adapters for transitioning from the York Sunline™ footprint.

Sun Pro ZR Specifications

ModelNominal
Tons
Gross Cooling
(Btu/h)
Net Cooling
(Btu/h)
SEEREERIEERHot Gas
Reheat Coil
Refrigerant
Circuits
Compressor
Stages
Gas Heat
Efficiency
ZR037336,00035,00014.011.5—Standard1Single81% AFUE
ZR049448,50047,00014.011.5—Standard1Single81% AFUE
ZR061559,00057,00014.011.5—Standard1Single81% AFUE
ZR0786.576,00074,000—11.011.8Standard2Two81% thermal
ZR0907.588,00086,000—11.011.8Standard2Two81% thermal
ZR1028.599,70096,000—11.011.8Standard2Two81% thermal
ZR12010124,000120,000—11.011.8Standard2Two81% thermal
ZR15012.5154,000150,000—11.011.8Standard2Two81% thermal

Baseline configuration shown: standard-static constant-volume indoor blower, no electric heat, two-stage gas heat where applicable. High-static and VFD/VAV blowers (6.5–12.5 ton),
electric heat, and other gas heat sizes are available. Ratings per AHRI standards.

ModelNominal Airflow
(CFM)
Dimensions L × W × H
(in.)
Operating Weight
(lb)
Roof Curb Height
(in.)
Electrical
Service
Base Electrical
MCA
ZR0371,20089 × 59 × 427198 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR0491,60089 × 59 × 427488 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR0612,00089 × 59 × 427658 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR0782,50089 × 59 × 50-3/41,0338 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR0902,50089 × 59 × 50-3/41,0358 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR1023,30089 × 59 × 50-3/41,0448 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR1203,40089 × 59 × 50-3/41,0708 or 14208/230/460/575V, 3-phaseConfirmed at quote
ZR1503,500119-1/2 × 59 × 50-3/41,2808 or 14208/230/460/575V, 3-phaseConfirmed at quote

Base electrical MCA figures are model- and voltage-specific (208/230V, 460V, 575V) and are confirmed at the time of quote based on the exact configuration selected.
Refrigerant, compressor stage, and dimensional data reflect the base cooling-only configuration; consult 4Most Energy for configuration-specific values.

Sizing a Sun™ Pro ZR begins with a Manual N or equivalent commercial load calculation for the space, followed by confirmation that dehumidification is a functional requirement. The ZR's standard reheat coil is best suited to retail, medical, laboratory, gymnasium, or other high-occupancy or moisture-sensitive spaces where independent humidity control matters. If the application does not require reheat, the higher-efficiency Sun Pro ZH or ZJ lines (same cabinet footprint) will typically deliver lower operating costs. Within the ZR line, select nominal tonnage (ZR037 to ZR150) to match the calculated load, then confirm the blower configuration (standard-static constant-volume or high-static VAV/VFD) and gas heat input size based on building heating load and available gas service. For loads above 12.5 tons, see the Series 20 J**ZR (15–25 tons). 4Most Energy's site assessment confirms final model selection against actual roof curb, electrical, and gas infrastructure before ordering.

Installation & Assessment Checklist

PhaseDescription & Key Requirements
Step 1Site Assessment4Most Energy evaluates roof curb condition and structural capacity, gas line sizing, and electrical service.
Step 2Equipment SelectionConfirm the ZR model, tonnage, blower configuration, and heat exchanger option based on the load calculation and dehumidification requirements.
Step 3PermittingSecure required building, gas, and electrical permits per the Ontario Building Code and the local authority having jurisdiction.
Step 4Rigging & PlacementThe unit is craned or forklifted into position on the roof curb using the base-rail rigging points.
Step 5Connection & CommissioningLicensed technicians complete the gas line connection, electrical hookup, ductwork tie-in, refrigerant charge verification for both circuits, combustion analysis, and Smart Equipment™ controller setup.
Step 6Final Inspection & DocumentationStartup report, combustion test results, and warranty registration are completed and provided to the building owner.

York® Sun™ Pro ZR units carry a 1-year complete unit parts warranty and a 5-year compressor warranty from the date of installation. The standard aluminized steel gas heat exchanger carries a 10-year warranty, extendable to 15 years with the optional stainless steel heat exchanger. Warranty coverage requires professional installation and startup by a licensed contractor, along with documented annual maintenance.
Because the ZR's reheat coil operates whenever dehumidification is called for, 4Most Energy recommends semi-annual maintenance visits (spring and fall) rather than the annual visit typical for standard cooling-only units. Maintenance includes reheat coil and evaporator coil cleaning, refrigerant charge verification for both circuits, filter replacement, electrical connection inspection, combustion analysis on gas-heat units, and control board diagnostic review via the Smart Equipment™ platform's on-board USB logging. 4Most Energy offers scheduled maintenance plans that keep this documentation in place for your warranty.

Service Area
Greater Toronto Area (GTA) and surrounding regions

 Toronto, Markham, Richmond Hill, Vaughan, Aurora, Newmarket, Scarborough, Brampton, and Mississauga.

Extended Service Area: Stouffville, Oshawa, Barrie, Orangeville, Hamilton, St. Catharines, Guelph, Kitchener.

Frequently Asked Questions

All three share the same cabinet footprint and roof curb, but the ZR includes a factory-standard hot gas reheat coil for dedicated humidity control, while the ZH and ZJ prioritize cooling efficiency without a reheat function.

No. If your space does not have specific humidity control requirements, the higher-efficiency Sun Pro ZH or ZJ line will typically provide lower long-term operating costs in the same footprint.

Eight sizes from 3 to 12.5 nominal tons (models ZR037 through ZR150), covering small commercial spaces through larger retail and institutional buildings. For 15 to 25 tons, see the Series 20 J**ZR.

In many cases, yes. The ZR shares a common footprint with other Sun Pro models, and roof curb adapters are available for transitioning from York Sunline™ or other manufacturers' curbs. 4Most Energy confirms curb compatibility during the site assessment.

At 719 to 1,280 lb, the ZR is placed by crane or forklift using the base-rail rigging holes and forklift slots on three sides. 4Most Energy plans the lift and roof access during the site assessment and includes it in your quote.

Because the reheat coil runs whenever dehumidification is called for, we recommend semi-annual visits (spring and fall): reheat and evaporator coil cleaning, refrigerant charge verification on both circuits, filter replacement, electrical inspection, combustion analysis on gas-heat units, and a Smart Equipment™ diagnostic review.

Rebate eligibility depends on the efficiency tier and the specific commercial program's thresholds, so 4Most Energy confirms current utility incentive eligibility at the time of quote. Residential programs do not apply to commercial rooftop equipment.

4.9Google star 1Google star 2Google star 3Google star 4Google star 5
4.9Google star 1Google star 2Google star 3Google star 4Google star 5
Top Rated Service
Verified by Trustindex
Top Rated Service
  • 4.9 Excellent rating Last 12 months
  • New reviews collected regularly Recent review activity detected
  • Leading Service Google Maps rating and review data
  • Responds to customer reviews 72% response rate within 48 hours
  • Verified by Trustindex Based on real customer reviews Learn more
Posted on Google Google
Brad Marks profile picture
Brad Marks
2 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Guys arrived on time, were careful to lay down protective covering for the floors, were very efficient in delivery executing the work and left the final area clean and tidy. Would definitely recommend for any future needs
Posted on Google Google
Ron Bull profile picture
Ron Bull
4 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Responsive, professional service. Technicians were diligent and respectful
Posted on Google Google
Mahvash Madani profile picture
Mahvash Madani
10 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
I had a great experience with 4Most Energy. They provided all the i formation I needed and clearly explained the different options available which made it easy to make an informed decision. Their pricing was reasonable and competitive, and I really appreciate their responsiveness and flexibility in accommodating my needs. The installation team was professional, efficient, and did a great job.Overall, the entire process was smooth and stress-free. I am very happy with the service and would highly recommend them for anyone looking for reliable HVAC services.
Posted on Google Google
H Lau profile picture
H Lau
19 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Posted on Google Google
Harini profile picture
Harini
25 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+0
We had a great experience with Rey and his team during our new Rinnai boiler installation. The technicians did an amazing job and worked efficiently. The technician Sam was knowledgeable, professional, and respectful throughout the installation. He took the time to answer all my questions and made sure everything was properly checked before finishing the job. They arrived on time and completed the boiler installation on schedule. We are very happy with the service and would definitely recommend them to anyone looking for reliable and professional HVAC service. Thanks.
Posted on Google Google
Vip C. profile picture
Vip C.
25 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+0
Excellent service and very reasonable pricing for a new AC installation. The team arrived right on time, provided a smooth and professional installation, and there were absolutely no hidden costs. Communication was transparent, proactive, and consistent throughout the entire process. Highly recommend them to anyone looking for reliable and honest HVAC service.
Posted on Google Google
kevin liu profile picture
kevin liu
28 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Posted on Google Google
Brian Johnston profile picture
Brian Johnston
30 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+1
I was very pleased with the competitive pricing I got specifically from 4most energy. I contacted many companies to get their best quote. Sometimes there are even daughter or sister companies that will give you better quotes than the parent companies. It's best to check around for the identical product with installation from many companies. I was also pleased with the installers. They did have to cut away some insulation to install the Rinnai RX199 on the outside wall the house. Not sure if they should have tried replacing that insulation afterwards, but won't complain about the job they did because I think I got the best price on the market after getting quotes from about a dozen companies.
Posted on Google Google
Joseph Spitale profile picture
Joseph Spitale
45 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+0
We recently had a Navien Combi boiler installed by 4Most Energy and had a great experience from start to finish. Rey was our sales representative and Sam was our technician, and both were excellent to work with. They arrived on time, the installation was fast and efficient, and everyone was friendly and professional throughout the process. Sam did a great job with the installation, and everything is working perfectly. We’re also very happy with the Navien Combi boiler itself. Overall, we couldn’t be happier with the service, the installation, and the product. We would definitely recommend 4Most Energy.
Posted on Google Google
Da big_Guy profile picture
Da big_Guy
46 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+0
Rey, Ben and Amad thank you very much for the amazing work on my hot water tank purchase and installation. You a have a loyal customer fir life. I will make sure my family and friends use your service. Zoran.
Posted on Google Google
Marvin Harrison profile picture
Marvin Harrison
48 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+2
I contacted 4Most Energy to replace my 14 year old AC unit. Their intake process was smooth. They provided a reasonable quote the same day. The installation of the new AC unit was scheduled and the service provided by Farzad and his associate was completed within a reasonable time. They did a great job on the installation, hauled away the old equipment, and left the job site (both indoors and outdoors) in good condition. I would not hesitate to recommend 4Most Energy for your heating and cooling needs.
Posted on Google Google
Rodney BROWN profile picture
Rodney BROWN
48 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+0
Scheduling was quick and easy. The team showed up on time, were quick and efficient and did an overall good job!
Posted on Google Google
Jag Jasani profile picture
Jag Jasani
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+0
Great job Rey, Sam and team! My tankless water heater was broken for two months and after getting the run around from Enercare and Reliance, I decided on purchasing a Navien from 4Most Energy and they did a great job explaining the process and installing it the next day. Thank you for the top notch service!
Posted on Google Google
Maryam Badakhshi profile picture
Maryam Badakhshi
56 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Hamid installed a new heater for us. We had a great experience. He and the team were professional and the work was done in a day. We really appreciate their promptness. We’d definitely recommend Hamid.
Posted on Google Google
Chris Luc profile picture
Chris Luc
59 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great job by Hamid. Thanks